Theatre Utrecht
Previous slide Next slide Project scope Work had to be carried out at the Utrecht Theatre in 2002 in order to meet health and safety legislation. There are a total of 75 STS new multi-wire winches with a capacity of 500 kg. The winches are placed vertically, at one side of the grid, so that … Read more