Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the generatepress domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/stsonstage/domains/stsonstage.com/public_html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the pods domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/stsonstage/domains/stsonstage.com/public_html/wp-includes/functions.php on line 6114
Natlab - STS Onstage

Natlab

Vorige slide
Volgende slide

Project omvang

In Eindhoven is het beroemde NATLAB, in 1914 opgericht door Gerard en Anton Philips nu 100 jaar later in 2014, omgebouwd tot een cultureel centrum. De gemeente Eindhoven investeerde 14 miljoen euro in de complete renovatie van het honderdjarige voormalige Philips Natuurkundig Laboratorium. Het project werd uitgevoerd naar een ontwerp van architect Peter Claassens van N-architecten in Maastricht.

De grote multi functionele zaal is door STS uitgerust met 21 stuks centraal bedienbare prolyte kettingtakels. De takels hebben een capaciteit van 250 kg D8+ en een variabele snelheid van 0-8 m/min. De takels zijn gemonteerd aan loopkatten op verplaatsbare hijsbalken boven de hele zaal. Een dubbele rem, veiligheidsfactor 10, eindschakelaars en een elektrische overload beveiliging.