Beatrix Theatre

Previous slide Next slide Project scope This theatre is in 2003 equipped with 25 computerized elements. Winches are used to move pieces with SWLs of 300 kg and 600 kg. The maximum speed is 1.8 m/s. The control is through STS’s AutoStage2000 system.  The controls are centrally located.  The OptiMaster2000 desk, a precursor of ‘The … Read more