Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the generatepress domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/stsonstage/domains/stsonstage.com/public_html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the pods domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/stsonstage/domains/stsonstage.com/public_html/wp-includes/functions.php on line 6114
Theatre Kerkrade - STS Onstage

Theatre Kerkrade

Previous slide
Next slide

Project scope

In this project all controllers, cabinets and desk of the Parkstad Limburg Theater (PLT) in Kerkrade- the Netherlands are replaced. Also the brakes a replaced for double brakes. Further we installed a complete new orchestra pitlift using spira lifts. 

The original installation is a Stakebrand type Centurion.

The safety of the installation is now based on the real use in the theatre. That means that extra safety measures are added and brought to a higher SIL level. Also functional updates are made (eg. 3,33 m/s2, desk faders, functionality, online service) and the availability is set on a higher level by the quality and redundancy of the system.

The total installation has more then 60 axis:

Flywall 500 kg 69x 
chainhoist   6x 
Orchestra room winches 4x
Moving proscenium brigde  1x
auditorium chainhoists 6x
Orchestra-pit lift (serapid) 1x
Moving stage (serapid)  0x / 6x
AV hoist winch 2x