Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the generatepress domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/stsonstage/domains/stsonstage.com/public_html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the pods domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/stsonstage/domains/stsonstage.com/public_html/wp-includes/functions.php on line 6114
Theatre de Lampegiet - STS Onstage

Theatre de Lampegiet

Previous slide
Next slide

Project scope

In this project all controllers, cabinets and desk of the Dutch Theatre de Lampegiet in Veenendaal are replaced. Also the brakes a replaced for double brakes.

The original installation is a Stakebrand type Centurion.

The safety of the installation is now based on the real use in the theatre. That means that extra safety measures are added and brought to a higher SIL level. Also functional updates are made (eg. functionality, online service) and the availability is set on a higher level by the quality and redundancy of the system.

The total installation has more then 60 axis:

Flywall 500 kg 51x 
chainhoists   
Moving proscenium brige  1x
auditorium chainhoists