MUSEUM 33 HOISTS
STS Onstage ยป MUSEUM 33 HOISTS
Previous slide
Next slide
Project scope
33 BGVD8+ chainhoists connected to 7 distribution points were supplied to a museum in the middle east.
The hoists can be operated via the Piccolo or locally on one of the distribution cabinets. Loadcells were used for overload protection.