MUSEUM 33 HOISTS

Previous slide
Next slide

Project scope

33 BGVD8+ chainhoists connected to 7 distribution points were supplied to a museum in the middle east.

The hoists can be operated via the Piccolo or locally on one of the distribution cabinets. Loadcells were used for overload protection.