Jubileumshow André van Duin

Previous slide
Next slide

Project scope

There are four trusses with sliders for the LED screens and displays in this show. Due to the heavy weight of the LED screens (1,000 and 1,400 kg), a double track has been chosen. Winches, which are integrated into the truss, are used to move the sliders. These are then connected with plug-in cables to the central AutoStage2000 control unit