Project scope

In this project all controllers, cabinets and desk of the Parkstad Limburg Theater (PLT) in Kerkrade- the Netherlands are replaced. Also the brakes a replaced for double brakes. Further we installed a complete new orchestra pitlift using spira lifts. 

The original installation is a Stakebrand type Centurion.

The safety of the installation is now based on the real use in the theatre. That means that extra safety measures are added and brought to a higher SIL level. Also functional updates are made (eg. 3,33 m/s2, desk faders, functionality, online service) and the availability is set on a higher level by the quality and redundancy of the system.

The total installation has more then 60 axis:

Flywall 500 kg 69x 
chainhoist   6x 
Orchestra room winches 4x
Moving proscenium brigde  1x
auditorium chainhoists 6x
Orchestra-pit lift (serapid) 1x
Moving stage (serapid)  0x / 6x
AV hoist winch 2x