Project scope

The Antwerp City Theatre is the location where the set of Mamma Mia Moscow first stood. In this theatre, we also delivered a new orchestra pit lift with 2×2 serapid chains. In order to give the moveable floor a place, a piece of overhanging concrete was sawn away and removed. Load: 5 kN/m2 static and net 1000kg dynamic. The push chain stroke is 3 metres. An electric motor is used as the drive.