There are four trusses with sliders for the LED screens and displays in this show. Due to the heavy weight of the LED screens (1,000 and 1,400 kg), a double track has been chosen. Winches, which are integrated into the truss, are used to move the sliders. These are then connected with plug-in cables to the central AutoStage2000 control unit